Target Design
Target Design Pending Changes
Use this page when Syncing Target Design and Map.
- Select Advanced Data Migration in the Navigation pane.
- Select Design in the Context bar.
- Click the Targetsicon on the Design page.
- Click
Pending Design Changes link in the STATUS OF SYNC field.
NOTE: This link is not available if Target Design and Map are in sync for the selected Target.
Field |
Description |
TARGET |
Displays the name of the Target table that has been updated. This Target must be synced with Map. |
DESCRIPTION |
Displays a description of the change to the Target table. This description was either imported with the table or added manually on the Targets, Target Sources, or Target Fields page. |
LOG DATE |
Displays the date the Target was changed. |
ACTION |
Displays the action performed on the Target (add, delete, insert or update). |
USERID |
Displays the ID of the user who made the change. |