ISA

Run Rules in IS

Run the rule to see the failed data.

NOTE: In IS, if the name of the view that is bound to the rule contains a period, columns will not download after the rule runs. Remove periods from view names in IS.

To run a new rule in IS:

  1. Click the Workspace Home icon in the tree toolbar on the left side of the page.
  2. Click Rule Results.

    NOTE: In the pane on the left, expand the source connection and click the check box next to the table name that has the rule.

  3. Click Calculate Score.

    NOTE: This runs the rule.

  4. Enter the name in the Name field.
  5. Select the name of the database connection that was created to store the failed data in the Save all field data to list box.

    NOTE: This is where the data that fails the rule is stored. It must be the connection to the IsFailedData database.

  6. Click Save and Run Now.

    NOTE: Once the rule is run, view the results on the Workspace Home page.

    NOTE: After a rule is run, it may require editing.

To edit a rule:

  1. Click the Tasks icon in the tree toolbar on the left side of the page.
  2. Select the rule name.
  3. Click Edit.
  4. Ensure that the option in the Save all failed data to: list box is the name of the database connection to the IsFailedData database.
  5. This connection name must be selected for ISA to work. Refer to Create a Database Connection to Store IS Failed Data for more information.
  6. Make changes to the rule as needed.
  7. Click Save and Run Now to test the changes.